Thursday, December 21, 2017

Frisco’s century-old Excelsior Mine Office, the town’s first source of electricity, moved for preservation

#Frisco #Colorado
Summit Daily Photo

Summit Daily Link


Bulldozers have come for many of Frisco's old cabins over the years, but on Wednesday morning, a crane showed up for the humble red house at 208 Galena Street.
It wasn't the first time the old Excelsior Mine Office was picked up and moved since its construction in 1895 at the mouth of Ten Mile Canyon, and it may not be the last. For developer Larry Feldman, who paid to truck the building off the lot to make way for new townhomes, the little red cabin is worth fussing over.
In the 1890s, the Excelsior Mine ran a power line down from its small hydroelectric dam on Ten Mile Creek, delivering electricity to Frisco for the first time. After the mine ran dry in 1913, the town went nearly two decades without power.
"It was the first time Frisco's residents enjoyed Edison's benefits," Feldman said while his crews fitted a custom-welded frame under the cabin to lift it up by. "When Excelsior shut down, Frisco was powerless until the 1930s. That's the part I think is really cool, and it's why I want to preserve this thing."
Feldman bought the property on Galena Street a little over a year ago. He didn't have a clue about the cabin's history until he started doing some research, learning about its connection to the Recen brothers, a trio of pioneers said to have lived extravagant lifestyles until their mining luck ran out.
"I've heard Andrew and Daniel were kind of playboys," Feldman said. "They would hook up a private rail car to trains and run around partying — but I'm still looking for more evidence of that."
A hiking guide published in 1996 says "the brothers tarried with 1880s silver magnates such as H. A. W. Tabor and celebrities such as songbird Jenny Lind" and "hired private rail cars for bachelor parties and consumed champagne and oysters with extravagant regularity."
Henry Recen founded the town of Frisco in 1873. He would later bring it electricity when he and his brothers owned and operated the Excelsior, near what is now an exit on Interstate 70.
Andrew and Daniel Recen's graves are up the Gore Creek Trail near the site of a cabin where they used to hunt and fish. When Daniel died, a nephew who lived in Frisco hiked his body up to the spot, but he was caught in a fierce storm on the way down. He took shelter in the Excelsior Mine office.
The cabin was moved to Galena Street in 1938, one of many historic buildings shuffled around Summit County as Dillon Reservoir flooded the Blue River Valley and new developments sprang up in the place of old cabins.
"We've watched over the years as a lot of these cabins here were bulldozed," said Claudia Kreumelmeyer, a neighbor who came out to watch the building get lifted onto a tractor-trailer. "It was very nice of Larry to do this."
Feldman expects to end up paying around $50,000 to save the cabin. He'll be handing over ownership to the town after dropping it off at the Frisco Adventure Park.
"It's a big part of Frisco's history," said Kreumelmeyer's husband Jon. "They had to move it down from Ten Mile before, and that must've been a chore. They didn't have equipment like this."
Over the past two decades, a handful of Frisco's original buildings were picked up and moved to the Frisco Historic Park and Museum on Main Street. Some of them had been moved before, as Summit County went from boomtowns to bust towns to ski towns.
Frisco has a hands-off approach to historical preservation, preferring to offer incentives to keep old buildings rather than mandate their protection.
Recently, the town has extended historic overlay zoning deals to a pair of developments, offering code waivers in exchange for preservation. But the notion of horse-trading density allowances to keep the bulldozers away has made some on the town council uncomfortable with the process, called historic overlay zoning.
Feldman initially wanted to keep the Excelsior where it stood and turn it into a museum sandwiched between residential buildings. It was one of the first historic overlays ever proposed, but the Planning Commission nixed the project because of its size, Feldman said.
His new project will be a small cluster of townhomes, totaling 13 units in a mix of single-family homes and duplexes.
Frisco hasn't yet decided what to do with the old red cabin that kept the lights on in town for nearly two decades. More than a century of wear and two relocations have taken their toll, and it will likely need some restoration work.
"A lot of different people have lived in this house," Claudia Kreumelmeyer said. "It'll be interesting to see what happens with it. I hope they fix it up and make it into something cute."

Wednesday, December 20, 2017

Summit County Highway 9 project could create four continuous lanes from I-70 to Breckenridge

#Breckenridge #Colorado
Summit Daily Photo

Summit Daily News Link


A $10 million highway project between Frisco and Breckenridge has been slated for state funding, potentially uncorking a chronic traffic bottleneck near the hospital and establishing four continuous lanes from Interstate 70 to Main Street in Breckenridge.
The project, known colloquially as "the gap," would put a finishing touch on the Iron Springs bypass, a re-route of Colorado Highway 9 between Farmer's Korner and St. Anthony Summit Medical Center that was finished in November. To the frustration of some drivers, the highway still returns to one lane in each direction near Frisco.
Funding for the gap project isn't final yet, but the Colorado Department of Transportation confirmed it is one of 11 slated to receive money from a $1.9 billion funding package passed by the State Legislature in the spring.
The provisional list of projects also includes $80 million of improvements to westbound I-70 in Clear Creek County that would add peak period shoulder lanes. Those have already been built on the east side, where they have eased congestion.
That could also benefit the Summit County economy, but the gap project is the top-ticket item for local transportation officials. Until a couple of weeks ago, it was unclear how it would ever get funding.
"Our highest priority is definitely the Highway 9 gap project," said Summit County public works director Tom Gosiorowski. "CDOT has money to complete the design, and we were all hopeful that money would magically somehow turn up for construction. The good news is that now it looks like it has."
Last month, CDOT placed the gap on its list of projects mandated for completion by the Sustainability of Rural Colorado Act, or Senate Bill 267, a sprawling piece of legislation that included nearly $2 billion in road funding over several years.
State officials are still confirming whether or not the full amount will materialize, because it was secured through lease-purchase agreements on public buildings. If all goes according to plan, the first batch of road money would roll in next July.
"The best case schedule would be if construction funds become available in the first part of 2019, the project could advertise for bids beginning in June of 2020," a CDOT spokeswoman said in an email. "We are expecting two seasons of construction for this final corridor project."
It could still be a while before shovels hit the ground, but the decision eases uncertainty among transportation officials that the project would languish unfunded for years.
"That sounds like a long way out, but that is actually as fast as this possibly could have gone," Gosiorowski said. "Had there not been a source of construction money, it could've gone on for years and years. So everybody's really excited."
Just a month ago, funding for the gap seemed like it might be a long shot. CDOT has roughly $9 billion in unfunded project across the state, and the legislature failed to reach a grand funding bargain during its last session.
Instead, it passed SB 267 as a stopgap, but it wasn't clear until now where the money would actually ago. A combined $450 million is provisionally slated for improvements to I-25 on the Front Range, while the rest of the money is set aside for rural counties.
The money is effectively a loan that CDOT would later have to pay back, unless the legislature finds another funding solution. But for now, local officials are just glad that the gap made the cut in an extremely competitive time for roadwork.
"CDOT had begun working on the design of the gap project before Iron Springs had even completed, so we were kind of taking steps to get the gap teed up for construction," Gosiorowski said. "But until recently, we always had this uncertainty about where the construction money was going to come from."
If the gap project goes through, it would eliminate the bottleneck between the County Commons in Frisco and the intersection at the entrance to SASMC.
It could also include overhauls of the intersections between Highway 9 and the traffic light for the county commons, at Peak One Blvd., and 8th Avenue in Frisco, a tricky turnoff that serves the southern half of town as well as a school and a fire station.
Designs for the project are only about 30 percent complete, Gosiorowski said. But engineers are looking at possibly putting in a traffic light or roundabout at 8th Avenue and Highway 9 and replacing the Peak One Blvd light with a roundabout.
All told, the project would significantly remake the well-travelled route from I-70 to Breckenridge and ease the choke point that slows traffic outside of Frisco to crawl during peak hours.
The project would also include bike, pedestrian, transit and drainage improvements, as well as noise walls near residential areas, the CDOT spokeswoman said. A public meeting will be held in the spring to present the design.

Tuesday, December 19, 2017

Breckenridge leaders hold off voting on proposed luxury hotel at base of Peak 8

#Breckenridge #Colorado
Summit Daily News Photo

Summit Daily Link


If the density fits, Breckenridge might get a Ritz. That's where the proposal to build a four-star, luxury hotel at the base of Peak 8 currently sits.
Naming brand names at this point is entirely premature, especially since Breckenridge Town Council decided last week to pull back from voting on a proposed development agreement for the hotel over questions about the density of the project.
"Look, there is just no way for the seven people up here to tell you 62 TDRs is going to fit," said Mayor Eric Mamula referring to additional density requested by the hotel developers. "I can't tell you if two are going to fit. So we get a fit test, come back to the development agreement, and again with a development agreement, there are no promises. It's just there's a potential, and there's a potential."
The Miami-based firm Lionheart Capital is working in a three-way partnership with the local time-share company Breckenridge Grand Vacations and ski giant Vail Resorts to build a branded, four-star luxury hotel at the base of Peak 8 at Breckenridge Ski Resort.
Most basically, Lionheart has the money on hand and experience building large-scale luxury hotels in high-dollar resort markets. Meanwhile, Breckenridge Grand Vacations comes with local know-how and a long history of working with the town, and Vail Resorts owns the land on which the hotel would be built.
The hotel would go up where Vail Resorts' administration building is, adjacent to One Ski Hill Place, at the base of Peak 8 at Breckenridge Ski Resort. Developers say there is nothing else like it in Breckenridge right now, and they believe the four-star luxury hotel would fill a desperate need for lodging accommodations that's not currently being met.
The hotel would be along the lines of a Ritz-Carlton, J.W. Marriott or Hilton, according to developers, who say it's too early to talk about the specific branding with any kind of certainty because they will have to get approved to build the hotel first.
One question the town will have to answer hinges on the density of the project, as developers are hoping to exceed the maximum allowable density for the parcel by purchasing 62 transferable-density rights from the Summit County and town governments for about $3 million, based on today's going rate.
Developers and the town began informal discussions regarding the proposed hotel at the council's Nov. 14 work session meeting, where developers revealed the hotel would have to come with a residential component.
The initial discussions were designed to give the developers and town officials a chance to feel each other out, so to speak, and see if the project was feasible. At that time, developers indicated that, based on how those early discussions went, a formal application could be forthcoming.
During the November work session, it was also revealed that the proposed hotel wouldn't be financially viable without over 100,000 square feet of wholly owned condos, which accounts for the bulk of developers' request for additional density, in addition to some additional density for a restaurant and spa.
Lionheart Capital submitted its formal application on Dec. 1, along with a draft of a proposed development agreement, according to documents included in the Dec. 12 town council meeting packet.
The development agreement would basically enable developers to ask the town for certain things that outside of current building regulations, such as going above the maximum allowable density, according to town staff.
Council reviewed the documents during its Dec. 12 work session before its regular council meeting scheduled for later in the day, and a memo from the town attorney laid out the elected officials' options as they weighed the formal hotel request.
According to the memo, council could have opted to end all discussions, effectively killing the project, if they wanted. Another option would have had council take up the development agreement during its regular meeting, at which time the elected leaders could have voted on the development agreement.
Council also could have asked Lionheart Capital to revise the proposal, according to the memo, which details a fourth option in which council could hold off voting on Dec. 12 and kick the matter back to the town's planning commission for review at its next meeting.
Ultimately, council decided to pull the development agreement from Tuesday night's meeting agenda and seek the planning commission's input after deciding they just didn't have enough information to move forward with a vote.
"I think we need to go to planning," Councilman Jeffrey Bergeron said responding to a question from the mayor asking how everybody felt about the proposal.
Others echoed Bergeron's position, and the proposal now goes to the planning commission, which is expected to have a "fit test" regarding the additional density, which wasn't available to council at the Dec. 12 work session.
In addition to density, other issues still have to be hashed out, such as the potential impacts on housing, parking and traffic, for example.
"I appreciate you guys are working on all the right questions, and there's a lot of questions here," Councilwoman Wendy Wolfe told the developers during last week's work session. "I'm just looking forward to driving toward these answers and seeing where we come out, but I do think the planning commission's fit test will be helpful."
Councilman Mike Dudick, who's also co-owner and CEO of Breckenridge Grand Vacations, recused himself from the discussions.
According to town staff, the town is now trying to see if the proposed density "has a fair shot" at passing. To determine this, they will look at things like site buffers, internal circulation and building heights, among other building specs, before rendering an opinion.
"There's just so many unknowns for us to be able to do a development agreement," Councilman Mark Burke told the developers. "For me, I just can't get my hands around it right now."
The planning commission's next meeting is Jan. 2.

Monday, December 18, 2017

Silverthorne town council rejects design for downtown apartments

#Silverthorne #Colorado
Summit Daily Photo


Summit Daily Link

The developer of a proposed apartment complex along the Blue River in Silverthorne will revise his designs after elected leaders all but rejected them last week, saying the blueprint was simply too much for such a prominent downtown location.
The private land at 300 Blue River Parkway currently houses two businesses, Uncle John's Farm Stand and the Higgles Ice Cream Food Truck, in addition to parking for the Silverthorne Town Center and a picnic area.
It's prime Summit County real estate, and not lost on Silverthorne Town Council was the proposed three-story, seven-unit apartment complex — with rooftop patios 35 feet above ground level — which would be one of the first structures welcoming people into the downtown area.
"I think this thing is just totally outside the human scale that we prescribed and the message that we try to send in our design standards," Councilman Kevin McDonald said as council weighed the project during a regular meeting Wednesday. "To have someone walking by this thing and have them looking straight up at a 30- or 40-foot wall is just completely out of character for Silverthorne."
Per town code, apartments have been identified as a "use by right" within the downtown district. The developer, Tom Ethington, said he tried to adhere to the town's vision in proposing the seven-unit complex. However, in trying to live up to the letter of the town's development code, elected officials said they felt like he missed the spirit of what they're trying to do in the downtown area.
During public comments, five people spoke out against the proposed apartments, expressing their concerns over everything from parking and snow removal to rental agreements and the building's overall footprint.
"I just think there's a lot of work to be done here," said one of them, Eddie O'Brien, who's also a longtime member of the town's Economic Development Advisory Committee. "I'm not the kind of guy to say, 'You shouldn't be building (apartments) in this area. But boy, the sensitivity to all the work that we've done over the last 14 years to get this core area set — and this is a beautiful location — this doesn't fit."
The developer tried to answer the citizens and council's concerns as best he could.
In describing the tenants he'd target, he told them to look no further than who's already living at the Silverthorne Town Center, a retail hub next door to the proposed apartment complex with nine existing apartments.
Ethington's company owns both properties, and council was highly complimentary with what he's done so far to develop the center.
But the footprint was too deep, the space too tight, for the developer's proposal, council said.
Per designs, the new apartments would have gone up above first-floor garages. Council wondered if that might have pushed the complex up too high for the location adjacent the retail center, even though the highest point would be five-eights of an inch under the maximum allowable height of 45 feet for pitched roofs.
The 35-foot rooftop patios also posed safety concerns. The developer said they'd likely ban over-the-balcony snow removal in the renters' lease agreements — that the patios would be summertime amenities — but some people wondered if that would be enough.
"I've lived up here for a long time, and sometimes you want to be outside in the wintertime," McDonald said, adding "you don't want 20-pound heaves coming right at you" when you're standing below.
Hearing council's concerns, Ethington was given a handful of options, including pushing forward with the doomed proposal or asking for a continuance, which would allow him to come back at a later date with a revised design that council might be more willing to approve.
Ethington sought the continuance. Over the phone Sunday, he said he intends get with his architect to revise the plans and hopefully return with something more closely tailored to the town's desires in January.
Ethington's decision to seek the continuance followed council's unanimous approval of another proposed preliminary site plan for a three-story boutique hotel off Rainbow Drive, across the river from the proposed apartment complex.
The Pad, as it's being called, would offer hostel-style bed rentals in addition to other accommodations, and go up where the now-vacant Robinson Dairy building sits. Council green-lighted the hotel with 15 conditions that developers must remedy before obtaining final site-plan approval.

Sunday, December 17, 2017

County discusses regulations for the short-term rental business, again.

#Summit County #Colorado
Summit Daily Photo

Summit Daily Link


Summit County is laying the groundwork for short-term rental regulations as the hot-button issue was brought up again Tuesday morning during the Board of County Commissioners' regular work session.
Summit residents frequently mention short-term housing as an issue of concern, and the county has been debating for years over how to go about establishing rules and regulations for the booming industry. Towns like Breckenridge already have licensing requirements for short-term rentals, but there are no such rules for unincorporated property in Summit.
The arguments in favor of short-term housing are mostly about the money-making potential. Short-term rentals allow homeowners to make money off of unused space and make it easier to pay off mortgages.
However, short-term rentals have many negative effects for Summit County, which already has some of the most expensive housing in the state. According to the U.S. Census' American Community Survey, 68 percent of housing units in the county were vacant in 2016, up from 62 percent in 2012. That means a vast majority of Summit's housing is being used as second homes and vacation properties. Property investment groups frequently snap up new houses on the market and then flip them into short-term lodging, depleting the county's housing stock and raising the price of available units.
While Summit leaders have grappled with the issue for years, little has been done to establish actual rules for the industry. Assistant county manager Sarah Vaine explained that Summit lacks the basic foundation for comprehensive regulations.
"We do have a definition in our code about short-term rentals as rentals of less than six months," Vaine said. "However, we do not have anything else in our code regulating short-term rentals, aside from deed restrictions."
Vaine also presented data from short-term rental research vendor Host Compliance, a company that researches listings on short-term rental sites like Airbnb and VRBO. Their data shows that out of the estimated 5,100 short-term rental units listed in unincorporated Summit, only about 400 — or less than 10 percent — are registered with the state to pay sales tax. The figure stunned the commissioners.
County manager Scott Vargo cautioned the numbers are unofficial and may not be accurate, but that they do reflect the trends for short-term rentals in Summit.
"We know the amount of (short-term rental) activity is growing in leaps and bounds," Vargo told the board, "and we know that the sales tax generation is not growing commensurate with that. So we know we're missing a significant number of units paying sales tax, we just don't know what that number is."
Summit County Housing director Nicole Bleriot then presented data from the greater Keystone area showing that despite the exponential increase in short-term units, only 22 percent of the units were occupied at the time the data was collected.
"If you're in the lodging industry, that's a horrible number," Bleriot said. "So while the number of units are tripling and quadrupling, demand is not."
These numbers show that the negative effect of short-term housing on the housing market isn't actually bearing much fruit for most owners of short-term rentals. The financial arguments for keeping the industry unregulated seem less and less appealing.
Other counties in Colorado have adopted regulations for short-term rentals. Ouray, for example, requires permits for short-term rentals. The application requires an extensive amount of information about the owner and the property itself, and a list of rules that short-term rental owners must abide by in order to obtain the permit. These requirements include affirming that the short-term unit will be appropriate for the neighborhood and that any nuisances will be resolved immediately. The city and county of Denver require short-term rentals to be the owner's primary residence, meaning that one person can't buy up multiple properties and convert them all to short-term rentals.
Commissioner Thomas Davidson said that the BOCC is seriously considering similar regulations, and there is a broad consensus among community leaders that the county should pursue a regulatory framework.
"I think there's a fairly common argument," Davidson said, "that we need to come up with a set of regulations that provide a level playing field in terms of any business or individual that is involved in the activity of short-term renting."
Davidson also points out that there is a broader social problem to address when it comes to short-term rentals. The county has heard complaints from residents about nuisances related to short-term lodgers, who have no real connection to their neighbors. There is also the problem of large parts of residential areas becoming commercial in nature, altering the nature of the neighborhood and disrupting the sense of community.
"We need to think about what this means to community character, and that these residential neighborhoods maintain their residential character," Davidson said.
Davidson said that the BOCC plans to start building a foundation for regulations within the next year, and Summit might finally bring some order to the Wild West world of short-term rentals.

Saturday, December 16, 2017

A look ahead at holiday skiing as overnight storm helps Keystone, Breckenridge open terrain early

#Summit County #Colorado
Summit Daily Photo

Summit Daily News Link


Halfway through December, the snowstorm that struck Summit County late Wednesday night into Thursday morning bumped up the opening of the Lower 4 O'Clock and Gondola Ski Back trails at Breckenridge Ski Resort, in turn providing skiing and snowboarding access from the resort into town. Meanwhile over at Keystone Resort, the storm helped open an additional intermediate run out on its North Peak terrain.
Breckenridge has 280 acres currently open across Peaks 8 and 9, as the resort anticipates opening Peak 7 to skiers and snowboarders very soon.
The two resorts have also outlined their tentative plans for the holiday season, as early next week Breckenridge plans to open its Mercury SuperChair leading up to Peak 9 terrain as well as Peak 7 terrain and the Independence SuperChair for skiing and snowboarding on the intermediate Pioneer Trail.
BRECKENRIDGE
Breckenridge reported receiving 6 inches of new snow overnight while Keystone reported 4 inches. The conditions helped each resort, as Keystone Resort spokesman Russell Carlton initially said on Wednesday that Breckenridge planned to open Lower 4 O'Clock and the Gondola Ski Back trails on Friday to provide skier and snowboarder access from the resort into town. That plan changed Wednesday evening, once the snowfall forecast became clearer.
Carlton and Breckenridge spokeswoman Sara Lococo added that Breckenridge plans to open its intermediate Columbia trail on Peak 9 for Saturday.
And Breckenridge's newest restaurant, Pioneer Crossing, which serves crepes, will open when Peak 7 opens for the season.
KEYSTONE
Keystone's opening of its Anticipation trail and Wayback chairlift on Thursday pushes further open terrain off of the resort's main ski area, Dercum Mountain, as two blue runs off both sides of the 11,660-foot North Peak are now available for skiers to access.
Carlton added that the resort on Friday plans to expand its Schoolmarm Family Ski Trail through the currently closed beginner trail Last Chance on Dercum Mountain. And on Saturday, Carlton said the resort will open Dercum Mountain intermediate trails Flying Dutchman and Paymaster while the intermediate I-70 terrain in the A51 terrain park is also slated to open.
Those openings would push Keystone to more than 300 acres of skiable terrain, as the resort currently sits at 237 acres open.
As for black runs at Keystone, the Bergman Bowl is not currently available for hike-to access for expert skiing and snowboarding. And the resort will celebrate the opening of its new 190-seat indoor Labonte's Smokehouse BBQ restaurant, accessible via skiing down the Anticipation trail on North Peak, on Friday from 10:30 a.m. to 2 p.m.
KEYSTONE FOR CHRISTMAS
Following this weekend and prior to Christmas, Keystone is looking to open terrain at the 11,980-foot The Outback, as well as additional trails on Dercum.
EARLY OPENS AND NIGHT SKIING
Keystone will bump up its opening time to 8:30 a.m. this Saturday. The resort will also open its night skiing for this Friday and Saturday, as the resort will be open until 8 p.m. Friday and Saturday before returning to a 4 p.m. close Sunday through next Tuesday, Dec. 19.
Breckenridge will start its 8:30 a.m. opens on Friday.
COPPER MOUNTAIN
As of Thursday afternoon, Copper Mountain Resort had a comparable amount of terrain open to its guests versus the Vail Resorts, at 225 acres. That includes single black diamond terrain Rosi's Run over in East Village off of the Super Bee chairlift as well as intermediate runs Oh No, Skid Road and Andy's Encore in the same area. Terrain in East Village had been closed off until recently as the U.S. Ski team was using it for early season training.
In all, Copper also has 16 other trails open currently: intermediate runs Rhapsody, Max Vein and Bouncer (L) off of the American Eagle lift in Center Village; intermediate run Wind Song and the beginner run Minor Matter off of Timberline Express in West Village; intermediate Copperopolis and Ptarmagin off of the upper mountain Excelerator lift; beginner trail Green Acres off of the Pitchfork lift (as well as the Easy Rider learning area); beginner terrain Easy Road Too and High Point off of the American Flyer lift; and beginner trails Snodeal and Vein Glory (L) and (U) off of the Union Creek lift.
ARAPAHOE BASIN
In their Thursday morning snow conditions report, A-Basin staff teased a wave of openings in the later half of the month, that is, if Mother Nature cooperates.
"If this weekend's storms deliver," they wrote, "expect to see things opening rather quickly on the upper mountain."
As of Thursday afternoon, A-Basin received 3 inches in the past 24 hours and remained at 10 runs open, including intermediate runs Lower Mountain Blues and Upper Lenawee.
Earlier this week, A-Basin chief operating officer Alan Henceroth wrote on his blog that this season has been good for snowmaking in part due to ideal water flow on the North Fork of the Snake River. Henceroth added that A-Basin is allowed to divert water through Dec. 31 of each season.
"By the time we are finished in about three weeks," the COO wrote, "we will have made about 10 to 15 percent more snow than average."
With that, Henceroth said A-Basin's snowmaking priorities as of the beginning of the week included terrain around the currently closed Norway lift, such as the Treeline and High Divide terrain parks. Another priority is The Void, a shortcut from Ramrod to the bottom of Pali just above the Molly Hogan lift.
"Once those areas are complete," Henceroth wrote, "we will probably fatten up a few high traffic areas."
The COO added that the High Divide terrain park will have new features while the Treeline park will have a new build.

Friday, December 15, 2017

EPA completes effort to contain toxic runoff from abandoned mine near Keystone

#Keystone #Colorado
Summit Daily News Photo


Summit Daily Link

For decades, drainage from the toxic Jumbo Mine leaked dissolved cadmium, copper, lead and zinc into Summit County waterways. But thanks to a federal cleanup operation completed in October, one major contributor of metal contamination in the Snake River watershed is contained.
Jumbo Mine sits a couple hundred yards above a portion of Peru Creek that is so metal-contaminated it's considered a "dead zone" because it's unable to sustain life. Peru Creek flows into the Snake River 2 miles downstream, which in turn travels 10 miles before reaching the Dillon Reservoir, the main source of drinking water for Denver and its 1.4 million residents. According to the U.S. Environmental Protection Agency notice for the Jumbo Mine, the site was listed as a "Priority One" project for remediation. The escalation in priority came after lobbying from Snake River Task Force and other local stakeholders. The Colorado Department of Public Health and Environment listed Jumbo as a "significant" contributor of water degradation in the area.
Cleaning these contaminated sites is a major challenge for Summit County, as an entire bureaucratic process needs to take place before cleanup can even begin. Brian Lorch, director of Summit's Open Space & Trails department, said the county has been trying to buy up many of these sites for clean-up purposes, but faces an uphill battle.
"There are thousands of these tiny claims and abandoned mine areas across the mountains," Lorch says, "and each one poses unique challenges and issues that we have to deal with."
“That acidic drainage leached these metals and other solid material and transported them down into Peru Creek.”Duane NewellEPA coordinator overseeing Jumbo Mine cleanup
The county, working with state and federal authorities, has identified sites in urgent need of decontamination and has used several land purchase strategies to safeguard the areas, as well as create more protected open space. Jumbo is an example of a private-public partnership in which both the government and private landowner worked together to repair the area.
On Wednesday afternoon, Lorch provided a tour of the site, pointing to what seemed to be huge snowy mounds rising above the path. These, he says, are tailings, or huge waste piles of rocks that were dug out and left outside the mine entrance when it was active from 1915 to 1918. Those piles are the primary problem at Jumbo and many other mines like it, dotting the mountainsides and valleys and poisoning the water.
Duane Newell, the EPA coordinator overseeing the Jumbo cleanup, said the problem lies with acidic water draining out of Jumbo since the mine opening collapsed in the '60s. He explains that acidic water has been flowing out at rates of 30 to 100 gallons per minute, and some of that winds up flowing through the tailings.
"That acidic water was running across the waste rock pile, which is approximately 25,000 cubic yards," Newell explains. "That acidic drainage leached these metals and other solid material and transported them down into Peru Creek."
Newell says the problem was resolved by diverting water flow around the contaminated waste piles, using a durable "vapor" barrier liner to keep the water off the tailings, and then using limestone on top of that to neutralize the water acidity.
For now, the most significant issue with Jumbo is resolved, but other concerns, such as capping the tailings and acidic water flowing out of the mine, also need to be addressed.
Newell said that the funding is not there to address that quite yet, but the site is relatively stable for the moment.
Without intervention, the Jumbo site would have continued to contaminate the watershed. Newell notes that while Jumbo was a significant polluter, it is just one of many sources of contamination for Snake River. In 2013, the EPA began major clean-up operations a few miles away at the Pennsylvania Mine, considered one of the most polluted mines in Colorado and the single largest polluter of Peru Creek.
As mining's legacy continues to have consequences for the Snake River watershed and the county as a whole, Newell said the collaborative efforts of local stakeholders and government agencies such as the EPA are slowly but surely chipping away at the problem, and hopefully one day Peru Creek will be clean enough to support aquatic life again.
"It has been getting better over the years, definitely," he said.

Thursday, December 14, 2017

Shipping containers a design element for proposed Silverthorne hostel

#Silverthorne #Colorado
Summit Daily Photo

Summit Daily Link


A young couple hopes to tear down one of Silverthorne's most infamous eyesores and replace it with a roughly $6.5 million hostel that, they say, will greatly bolster the accommodations available to travelers in Summit County.
The duo, Lynne Parrish and Rob Baer, have certainly been inspired by their international travels, but the dorm room-style accommodations are only one piece of The Pad, a proposed boutique hotel that will offer private rooms, lodging for extended stays and even micro rooms, in addition to hostel-style bed rentals.
"The Pad is needed in Silverthorne as a refuge for adventure enthusiasts," Parrish said Tuesday via email. "Prices can be so high for lodging, resulting in many people making day trips instead of staying over."
Parrish continued by saying The Pad, once built, will provide a comfortable place to stay at an affordable rate, one where people "can relax by the fireplace or hot tubs with friends, maybe with a cocktail or glass of wine — and be walking distance to anything they'd need during their stay."
Most basically, The Pad is being designed as a kind of "home base" for people wanting pursue some of the many recreational activities in the surrounding area. More than that, Parrish and Baer are looking to create the kind of lodging accommodations they'd want for themselves.
"We think we'll be successful because we are creating a place designed by the traveler, for the traveler," Parrish said.
Both Parrish and Baer come from backgrounds in real estate development, and Parrish has the additional experience of working in the lodging industry, including managing a hostel in order to make sure this was the path she wanted to pursue.
"I look forward to building this from the ground up to have practices in place to make The Pad successful," Parrish said of a project that's more than three years in the making.
The Pad is on tomorrow's agenda for the Silverthorne Town Council, as Parrish and Baer hope to get their preliminary site plan approved.
Based on earlier discussions, town staff's findings and the planning commission's unanimous recommendation, the duo seems likely to get the thumbs up they're seeking.
Their plan describes a 35-foot, three-story hostel with 36 rooms with an apartment for an on-site manager, spacious patios, lounges, event space, a bar, small restaurant, community kitchen, bathrooms and gear storage.
The Pad would go up on about two acres at 491 Rainbow Drive, where the now-vacant Robinson Dairy building currently stands, on the east side of the Blue River, in the downtown core district.
Blueprints call for the hostel to be built using 16 prefabricated shipping containers, inconspicuously tied into a conventional steel and metal-framed construction. The repurposing of materials is one aspect of the Silverthorne project that greatly appeals to the duo.
"The idea to build with shipping containers came from a project we were part of in Costa Rica," Parrish said, explaining that they used 48 shipping containers for hotel rooms "to ensure each room had the best view over the ocean."
Drivers would come into the hotel off of Rainbow Drive, but foot traffic could take the existing sidewalk along Rainbow Drive and Center Circle or the 8-foot wide Blue River Trail running along the riverbank.
The developers say they've been self-funding the project to this point, and they "have a great group of investors that will help (them) get this project built and up and running."
Town staff have identified a number of foreseeable town-prescribed benefits associated with the project, not the least of which is its potential to help sustain "a critical mass of people continually present" within walking distance of nearby restaurants, shops and entertainment venues.
"In the Town Core District, the Comprehensive Plan also recommends the creation of gathering spaces, pedestrian connectivity, and the celebration of the Blue River, all of which have been incorporated into the proposed project," reads one excerpt of town planners' findings regarding the proposed hostel.
The developers are also in negotiations with the Lake Dillon Theatre Company about regularly putting up performers with the troop at The Pad.
Brookside Builders built the now-vacant building, which would be demolished to make way for hostel, in 1982. Robinson Dairy remodeled the building in 1986 and turned it into a warehouse and distribution facility for its dairy products.
The planning commission approved the preliminary site plan on Dec. 5, provided developers meet 15 specific conditions, such as tweaking the entrance and the roof for example, before obtaining final approval.
Most perimeters of the proposed hotel — i.e. lot coverage, snow storage, setbacks and landscaping — fall well within the town's guidelines for the downtown core. Wetlands and waterways should not be affected, according to town planners. Parrish said they'll be working with the design team and town staff to meet the conditions presented and remedy any problems.
Parris said the idea for a hostel came to her when she was living in South America. Originally, she said, she thought that would be the best place to open one, but she soon realized "the hostel scene was lacking and undeveloped in the U.S." That led her to shift her focus stateside.
Parrish said Silverthorne, with its proximity to Denver, breath-taking views, access to Interstate 70 and natural attractions, was an easy choice.
"After researching the best spot for one in the U.S., I chose Colorado in 2014 and I'm happy I did because not only did I find the perfect site in Silverthorne," Parrish said, "I also found the perfect guy — and he's now my partner in The Pad — truly making this a better project."
If everything goes according to plan, demo work could begin as early as next spring.

Wednesday, December 13, 2017

County passes 2018 budget

#Summit County #Colorado

Summit Daily Link


On Tuesday afternoon, the Summit County Board of Commissioners adopted the 2018 budget, which projects an uptick in both expenditures and revenue as the county continues to make major investments in workforce housing, capital projects and personnel, while seeing a significant increase in property tax revenue.
Summit's overall budget is projected to grow to a hair under $89 million in 2018, up from just under $88 million in 2017. Property tax receipts are expected to rise by 7.1 percent, and make up the largest single source of revenue for the county at 32 percent. Projections show sales tax will increase 2 percent and fee revenue will remain relatively flat, with a 1 percent increase over 2017. The county assessor evaluates the projected revenue increases over a two-year period, so these figures will be used to build the 2019 budget as well.
Property tax revenue is seeing a significant increase this year from 2016, which only saw a 1.4 percent increase from 2015. County Manager Scott Vargo attributes the jump to increased property values across Colorado and especially in the mountains and the Front Range.
When it comes to expenditures, notable increases are seen to the general fund, which is projected to increase from $27.3 million to $29.9 million, and the enterprise fund which will increase from $11 million to $13.7 million.
The general-fund increase is attributed to several new staff positions being added to the sheriff's department and the SCRAP landfill, as well as transfer to capital expenditures, nonprofit support, and salary and health care cost increases.
The bulk of the enterprise fund increase is going toward replacing two 4WD ambulances, equipment and system upgrades, as well as construction at the Lake Dillon Fire Rescue headquarters.
Special revenue expenditure will actually decrease from $40.1 million to $38.2 million, with much of it going toward affordable housing developments such as Lake Hill, as well as $2.9 million going toward road and bridge capital projects.
Vargo is relatively happy with how the budget process turned out, given certain practical and statutory challenges that were presented, such as a major internal software overhaul overseen by finance director Marty Ferris. However, a constant challenge to making the budget comes in the form of constitutional requirements, specifically the Gallagher Amendment and TABOR.
The Gallagher Amendment hamstrings the ability of country government to collect property revenue by enforcing a cap on how much residential assessed values make up the state's overall assessed value. The state caps the assessed value of residential property at 45 percent, with commercial and vacant land taking up the other 55 percent.
In practice, that means if the housing sector sees a boom (as the Front Range is seeing at the moment) then home values go up and homeowners wind up paying more than that 45 percent share of the assessment, unbalancing the ratio and mandating a tax cut for residential property.
"The tax assessment used to be 7.96 percent (of market value) for residential and 29 percent commercial," Vargo explained. "Commercial stays the same at 29 percent, but residential is dropping to 7.2 percent. So that 0.76 percent is just lost."
That 0.76 percent comes out to about $2 million in additional tax revenue that the county loses forever unless there's a tax hike to restore it. But that leads to a problem on the other side of the tax equation: TABOR.
The Taxpayer Bill of Rights makes it difficult to recoup that loss, as any attempt to get back to the previous tax assessment must be approved by voters, or through a capped increase that does not keep up with the dramatic decreases. So even though that projected 7.1 increase in property tax revenue seems significant, it is still causing gaps in funding that can't be filled.
Despite these challenges, Vargo says Summit actually came out even.
"Even though we saw $2 million less in revenue than we would have realized, we didn't see a drop in revenue," he said.
Vargo attributes this relative success by the county's strategy of keeping revenue estimates conservative, and as it turns out the increase in residential values made up that shortfall. Additionally, moderate expenditure estimates might mean the county spends less on budgeted projects in 2018 than anticipated.
As the county implements the proposed budget, Vargo, Ferris and the rest of the staff will turn their attention to the 2019 budget and all the challenges it brings.
County Commissioner Karn Stiegelmeier credited Summit residents for voting in favor of initiatives allowing expansion of several key county programs.
"Voters' support for programs like open space protection, workforce housing and emergency services has been essential to our ability to address community needs and priorities," she said.

Tuesday, December 12, 2017

Frisco hosting skate park redesign discussion

#Frisco #Colorado

Summit Daily Link


The town of Frisco is inviting residents to share their ideas and participate in a community conversation on Tuesday evening, Dec. 12 about the coming overhaul of Frisco Adventure Park's skate park.
After interviewing five different companies, the town selected Evergreen Skateparks of Portland, Oregon, for the design and rebuild of the park. Company representatives will hosting the community conversation, which is scheduled for 5:30 p.m. at the Frisco Adventure Park Day Lodge located at 621 Recreation Way.
A free beer and appetizers will be provided for attendees.

Monday, December 11, 2017

Breckenridge needs donations of old skis to reclaim longest shot ski record

#Breckenridge #Colorado
Breckenridge Tourism Office


Summit Daily Link

Got old skis and want to help Breckenridge make history — again? There's a donation for that.
In preparation of next month's attempt to break the "unofficial" world record for the longest ski shot, Breckenridge Distillery is now taking donations of old skis, and they're going to need a lot of them.
Skis can be dropped off at the distillery, 1925 Airport Road in Breckenridge, to be included in what's become an ongoing battle between Breckenridge and Park City, Utah.
According to Austyn Dineen of the Breckenridge Tourism Office, Park City took over the ski shot record in October, and Breckenridge will need 1,266 participants when the town tries to reclaim the title at its annual Ullr Fest celebration, Jan. 10-13, in Breckenridge. Dineen said that last year, Breckenridge had 1,234 participants and the ski shot stretched 1,250 feet down Main Street.
It's an unofficial record because the Guinness Book of World Records, fearing possible lawsuits, banned all records related to alcohol in 1991, according to news reports.